Blog

News, tips & advice.

Updates and practical advice on solar, batteries, EV charging and electrical safety.

Workplace EV Charging Point Installation

Workplace EV Charging Point Installation

A row of chargers may look like a straightforward staff benefit, but the work behind it starts well before a unit is fixed to a wall. A properly planned workplace EV charging point installation must suit how people use the site, the available electrical capacity and the organisation’s plans for electric vehicles over the next few years.

For a business, the right installation can support staff retention, make fleet charging more practical and provide a useful facility for visitors. The wrong approach can leave chargers queuing for limited power, bays blocked by non-electric vehicles or expensive alterations needed when demand grows. The aim is not simply to install the most charge points possible. It is to provide safe, dependable charging that works for the premises.

Start with demand, not the number of chargers

The first question is how vehicles will be charged during a normal working week. A site with employees parked for eight hours has different needs from a delivery depot where vans return between shifts. Long dwell times often make 7 kW AC charging a sensible, cost-effective choice, as vehicles can gain a useful charge while staff are at work. Fleets with short turnaround times may need higher-capacity charging and a more detailed review of the incoming supply.

Consider who will use the bays: employees, visitors, fleet drivers or a mixture of all three. It is also worth deciding whether charging will be free, subsidised or paid for at a set tariff. That decision affects the type of charging system and management platform required.

Growth matters too. Installing two chargers today does not mean the electrical design should only account for two chargers forever. Allowing for cable routes, spare ways in distribution equipment and future capacity can avoid unnecessary disruption later. A phased installation is often the sensible middle ground: install the infrastructure needed for expansion while fitting the number of charge points the business can justify now.

What a workplace EV charging point installation survey should cover

A site survey is where good planning becomes a safe, correctly specified installation. It should look beyond the car park and include the building’s existing electrical system, supply arrangements and daily operations.

Electrical capacity and load management

EV chargers can place a significant additional load on a commercial installation. Before work begins, the electrician needs to assess the incoming supply, existing maximum demand, the condition and capacity of distribution boards, and the likely charging demand at different times of day.

This does not automatically mean a supply upgrade is required. Smart load balancing can share the available capacity between charge points and reduce charging output when the building is using more power. This is particularly useful where several vehicles plug in at once, but it needs to be set up around the site’s real demand rather than assumed figures.

For some premises, a supply upgrade, new distribution board or a separate charging distribution arrangement may be the better long-term solution. Where changes to the supply are needed, the relevant Distribution Network Operator requirements must be considered early, as this can affect programme and cost.

Charger locations, routes and protection

Convenient parking bays are not always the best electrical locations. Cable routes must be practical, protected and tidy, whether they run through a building, across a yard or underground to a freestanding pedestal. The location must also allow drivers to connect without trailing leads across walkways or vehicle routes.

Bollards or wheel stops may be needed where chargers are exposed to vehicle impact. Outdoor equipment should be suitable for its environment, including weather exposure and the risk of damage in busy commercial yards. Clear signs and bay markings can prevent charging spaces being used as ordinary parking bays.

Accessibility should be considered as part of the layout, not added as an afterthought. Space around the charger, cable reach, kerb heights and the position of payment or access controls can all affect how straightforward the facility is to use.

Selecting the right charging equipment

Most workplaces will choose between wall-mounted units and pedestal chargers. Wall-mounted units are often ideal where bays sit alongside a building. Pedestals are useful for open car parks or where chargers need to serve bays on both sides, although trenching and groundworks may increase the project cost.

The charging speed is only one part of the decision. A good workplace system should also offer the controls the business needs. These may include user access through cards or an app, scheduled charging, consumption reporting and the ability to set different tariffs for staff and visitors.

For a fleet, reporting can make it easier to understand charging costs by vehicle or driver. For staff charging, access control prevents unauthorised use and gives the business flexibility if its charging policy changes. Open-access chargers may suit customer-facing sites, but they need clear arrangements for payment, support and parking enforcement.

Choose equipment with a realistic view of ongoing use. The cheapest unit is not always the best value if it offers limited support, poor reporting or no sensible way to expand the system. Equally, a highly specified networked solution may be unnecessary for a small private car park with a handful of regular users.

Installation, testing and compliance

Workplace charging equipment is part of the electrical installation, not an add-on appliance. It needs dedicated circuits, suitable protective devices, correct earthing arrangements and installation to the current requirements of BS 7671. The exact design depends on the supply type, charger specification and site conditions.

A professional installation also includes formal inspection and testing once the work is complete. The business should receive the relevant electrical certification, alongside clear information on how the chargers operate and any maintenance requirements. For organisations responsible for multiple sites, keeping this documentation organised is helpful for facilities management, insurance and future electrical inspections.

Good workmanship is visible in the details: containment that is straight and secure, cables routed where they are protected, penetrations properly finished and the work area left clean. At BMC Electrical Services NW, the standard is simple: power, properly wired, safe, tidy and fully tested.

Set a charging policy before the first vehicle plugs in

Even a well-designed system benefits from simple rules. Staff need to know who can use the chargers, whether they must move their vehicle once charging is complete and what happens if a bay is occupied by a non-charging vehicle. Fleet drivers need a clear process for prioritising vehicles that must be ready for the next shift.

The policy should also cover costs. Some businesses provide charging as a benefit, while others recover electricity costs through the charging platform. If tariffs vary by time of day, scheduled charging can help control expenditure without inconveniencing drivers who are parked for most of the day.

Review the data after the first few months. Charge-point usage often reveals whether bays are in the right place, whether access rules are working and when demand is likely to justify expansion.

Pair charging with solar and battery storage where it fits

For businesses with suitable roof space, Solar PV can contribute to daytime charging demand. This will not guarantee that every vehicle charges solely from solar generation, particularly in winter or during busy periods, but it can reduce imported electricity when generation and charging coincide.

Battery storage may provide further flexibility by storing surplus solar energy or reducing peaks in demand. Whether it is worthwhile depends on the site’s electricity tariff, load profile, available space and how often vehicles are charging. These systems should be assessed together rather than treated as separate projects, so that the electrical design supports the best use of each technology.

Plan for a system that can grow

A workplace charging project should leave the site in a better position for the next decision. That may mean spare capacity in a distribution board, ducting installed beneath a car park or a load-managed system that can accept more chargers later. It is usually less disruptive and more economical than reopening finished areas when demand increases.

The best starting point is a survey based on your actual premises, vehicles and working patterns. With the right electrical assessment and a clear plan for expansion, workplace charging becomes a practical part of running the site rather than another problem for the facilities team to manage.